The trailer was put on the back burner so I could focus my time on the new 4Runner. I was getting burnt out working on the 4Runner, and I need to make up my mind about a couple things. So it seemed like a good time to get back to work on the trailer.
I left off with these lame pictures ...
I left off with these lame pictures ...
#271
#272
I started working on the firewood / trash container a few weeks ago but I never posted any pictures. Keeping with the cheap or free theme I used some old square tube we had laying around, it had a little surface rust but was in good shape.


Then i got to work installing the expanded steel





Then i got to work installing the expanded steel



#273
That's how it sat for a few weeks, but it was time to get back to work making the one million spot welds that hold the storage box together. 
I installed the front section

Then I worked on the side


I installed the front section

Then I worked on the side

#279
#280









... 