The Fab Shop Tube buggies, armor protection and anything else that requires cutting, welding, or custom fab work

Wait time for SAS?

Thread Tools
 
Search this Thread
 
Old Nov 3, 2006 | 09:36 AM
  #1  
spaceycayce's Avatar
Thread Starter
Contributing Member
 
Joined: Oct 2006
Posts: 367
Likes: 0
From: Los Angeles
Wait time for SAS?

I'm just wondering what is a reasonable amount of time for a shop to complete a SAS. My 4runner went in on Oct 10 and the parts were ordered then. They got there by the 20th. How many days should I give the shop before I start bugging.
Reply
Old Nov 3, 2006 | 09:56 AM
  #2  
Robinhood150's Avatar
Contributing Member
 
Joined: May 2002
Posts: 6,033
Likes: 3
From: Wandering around Phoenix
Depends on the shop. I'd say anywhere from 3-4 months to a year.

I'm being half serious too.

Keep in touch with them, visit to see progress, but don't expect to get it back soon or on time.

let's move this over to the fab shop

Last edited by Robinhood150; Nov 3, 2006 at 10:03 AM.
Reply
Old Nov 3, 2006 | 11:20 AM
  #3  
Flygtenstein's Avatar
Registered User
 
Joined: Sep 2002
Posts: 4,216
Likes: 1
From: Fort Collins, CO
Two answers on this.

First, how long did they say when you dropped the rig? If a time frame wasn't mentioned then, then you have little recourse on however long it actually takes.

Second, it's done when it is done. If no time frame was specified in early quotes and you didn't say it needed to be out of a special event later, plan on waiting.

Depending on what truck and how exotic you are going, it should be between 35 and 60 hours of work as a guestimate. If all the parts are there and that is all they work on, that should take a little more than a week. That never happens though.

I spent 4.5 months waiting to get an engine swap done that was supposed to take 4 weeks. I was ready to come with a flatbed and the sheriff to get the truck out.

Tell them you want it as soon as is possible. Ask what has to happen for that to occur. Tell them you would like updates weekly even if it is just a call to say they hit a snag. Stay open and communicate.
Reply
Old Nov 3, 2006 | 02:55 PM
  #4  
spaceycayce's Avatar
Thread Starter
Contributing Member
 
Joined: Oct 2006
Posts: 367
Likes: 0
From: Los Angeles
I talked with the shop today and they said they had the front almost done. The shop said it took him a bit to cut off all the IFS and that they had to grind the burrs quite alot. He said that the rear won't take as long and to keep checking in every 3-4 days or so. Thanks for the help.
Reply
Old Nov 3, 2006 | 03:00 PM
  #5  
neoworm0's Avatar
Registered User
 
Joined: Jan 2005
Posts: 659
Likes: 1
From: North Vancouver, BC
I dropped my truck off friday night and drove it home from the shop Sunday night. Everything done but the front driveshaft.
Reply
Old Nov 3, 2006 | 03:25 PM
  #6  
drguitarum2005's Avatar
Contributing Member
 
Joined: Dec 2005
Posts: 2,226
Likes: 0
From: Houston (home), Atlanta (school), Cincinnati (work)
Originally Posted by neoworm0
I dropped my truck off friday night and drove it home from the shop Sunday night. Everything done but the front driveshaft.
THAT is an insanely fast turnaround
Reply
Old Nov 3, 2006 | 03:38 PM
  #7  
jsnby's Avatar
Contributing Member
 
Joined: Nov 2005
Posts: 486
Likes: 0
From: Glendale, CA
AJ at bentup did mine basically in a day...we started at 6:30 am. He did the cutting/grinding/welding, I did the axle rebuilds, then we both put it together.

we were done that night at 2:30am.

came back the next day to mount the rear shocks and drove it home

it was a long day to say the least.
Reply
Old Nov 3, 2006 | 07:52 PM
  #8  
4RunnerKid's Avatar
Registered User
 
Joined: Aug 2004
Posts: 1,028
Likes: 0
From: SLO, CA
AJ at bentup did my buddy's in a weekend, IIRC. it was only the front swap though. it all depends on the shop and their priorities and work ethic.
Reply
Old Nov 3, 2006 | 08:21 PM
  #9  
Rockdustfab's Avatar
Registered User
 
Joined: Nov 2006
Posts: 13
Likes: 0
From: Winston-Salem, NC
I did a swap from a Friday at about 2:00 to Monday at about 7:00PM. That was with alot of help with grinding on Saturday, and we did not work late any night (not after 10:00). We had planned to do it in 4 days, alot of Monday was spent running around to get a brakeline made (someone cut one w/ a grinder), and to get the driveshaft made.

Your best bet would have been to get the parts before you took it to the shop.
Reply
Old Nov 4, 2006 | 07:37 PM
  #10  
yotaman's Avatar
Registered User
 
Joined: Mar 2005
Posts: 1,165
Likes: 6
From: Cumming, GA
A bud and me did the front in 3 days and the rear in about 2 and a half.
Reply
Old Nov 4, 2006 | 07:40 PM
  #11  
Corey's Avatar
Co-Founder/Administrator
iTrader: (1)
 
Joined: May 2002
Posts: 32,242
Likes: 21
From: Auburn, Washington
AJ was also featured in an issue of 4WD Toyota Owner magazine doing a SAS in one day, even when the power went out at the shop.
Reply
Old Nov 13, 2006 | 02:12 PM
  #12  
blacksheep's Avatar
Registered User
 
Joined: Aug 2006
Posts: 112
Likes: 0
From: San Diego
6 months for my fab guy. He worked on it after work for hobby.
Reply
Old Nov 13, 2006 | 05:21 PM
  #13  
SAS'dToy's Avatar
Registered User
 
Joined: Dec 2004
Posts: 329
Likes: 0
From: Granite Falls, NC
I can do one in 3 days if I'm lazy
Reply
Old Nov 13, 2006 | 08:22 PM
  #14  
KSTacoma's Avatar
Registered User
 
Joined: Jan 2004
Posts: 96
Likes: 0
From: Maryland
I started mine a friday at 6pm and was done sunday morning. I had 3 other guys helping me though.
Reply
Old Nov 13, 2006 | 08:34 PM
  #15  
Flygtenstein's Avatar
Registered User
 
Joined: Sep 2002
Posts: 4,216
Likes: 1
From: Fort Collins, CO
How fast a shop does it as a priority.

How fast a shop does it in the background.

How fast one guy does it.

How fast one guy does it when he has to drive it Monday.

These are all grossly different time frames with no factor for rig, late model is slower, suspension, links are harder or variables.

If you took it to a shop and didn't set or ask for a deadline, plan on waiting awhile.
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Regency
General Electrical & Lighting Related Topics
20
Jan 3, 2020 07:43 PM
crashburnoveride
Misc Stuff (Vehicle Related)
3
Aug 28, 2015 09:20 PM
crashburnoveride
86-95 Trucks & 4Runners
1
Jul 10, 2015 06:39 AM
karbin
Newbie Tech Section
1
Jul 5, 2015 11:37 PM




All times are GMT -8. The time now is 03:22 PM.