would u put a new motor in or part out...
#21
Contributing Member
2LT II Diesel here. Rebuilding the 3VZE will cost well over $1500 and then there's the question of how long the rebuilt engine will last. 2LT II has mechanical injection so I can get rid of the electronics. It will move the '95 as well as the current 3.0 and it can burn diesel, biodiesel or WVO.
Of course, I also have to replace the transmission, transfer case, instrument cluster and weld in new motor mounts.
Of course, I also have to replace the transmission, transfer case, instrument cluster and weld in new motor mounts.
#22
Registered User
man, i don't know about the 2lt II diesel being more powerful than the 3VZE. i think that one was just on par with the 22RE if not a little more torquey. i think you'd want something more like a 3L, 5L, or a 1KZTE
#23
Contributing Member
Nope, the 2LT II doesn't have the power that the 3VZE, but I wouldn't have to wire any electronics either. It actually came in some Surfs. The 3L doesn't have the solid reputation of the 2L and requires wiring in a ECU. The 1KZTE has a pretty good rep but requires wiring in a ECU also.
2LT needs a ground strap, wire to the alt and the IP and you're good to go.
2LT needs a ground strap, wire to the alt and the IP and you're good to go.
#26
Registered User
Originally Posted by BruceTS
Definately I'd install a used japanese imported engine........ Oh! wait! I already did that
Barring above, I'd rebuild my 3vze with forged internals....
Thread
Thread Starter
Forum
Replies
Last Post
Spicer
86-95 Trucks & 4Runners
7
06-10-2020 08:39 PM
crazypaint
Buying & Selling Advice - Feeler/Gauging Interest
3
06-23-2015 03:27 AM