This engine bottom end stuff is getting confusing.....
#21
Registered User
Join Date: Dec 2006
Location: Las Cruces, NM
Posts: 383
Likes: 0
Received 0 Likes
on
0 Posts
The quote I got from a reputable machine shop here in Denver (they do lots of Toyotas) was about $1000. This was a complete rebuild of a 22R-E short block. Machine work was hot tank, check deck for flatness, bore cylinders, crank, rods, balance. New pistons, rings, bearings (not Toyota), freeze plugs. They would do the assembly, which I think is important so that they could adjust for tolerances if needed. I did not ask for the price on a line bore of the mains, which is a good thing to do. The labor vs. parts was bout 50/50.
Thread
Thread Starter
Forum
Replies
Last Post
Regency
General Electrical & Lighting Related Topics
20
01-03-2020 07:43 PM